Soundly RunSound familiar?

Asked after the slides were printed

The reorg was announced Monday. The listening sessions started Tuesday. Every concern raised had already been decided against.

InsteadAffected people answer the draft before anyone decides.

The video

Video planned60 secondsHow every video is made
The script
The one point
The people a change affects answer the draft before the sponsor decides, and the decision record keeps each objection with its answer.
Why a video
The same moment shown twice: one reorg in two orders, decide then ask versus draft, answer, decide, side by side, with time passing between announcement and listening, and the sponsor deciding live.
  1. Intro0:00-0:03sting

    Picture
    Brand mark and sound, then the heading ‘Asked after the slides were printed’ on the site’s background, fading straight into the guide with no black.
    On screen
    Asked after the slides were printed
  2. The moment0:03-0:12person

    Picture
    Guide in the standard room and place. Lower third: guide’s first name, ‘Soundly Run guide’. Burned-in captions.
    Voice
    The reorg was announced Monday. The listening sessions started Tuesday. In a company this size, the sponsor sits furthest from the work, so asking comes last.
    On screen
    Announced Monday. Listening started Tuesday.
  3. The cost0:12-0:21motion

    Picture
    A timeline: ‘Decided’ stamp, then ‘Announced’, then ‘Asked’. Concern notes arrive after the stamp and bounce off it. A loop arrow draws back: a second announcement, a second round of meetings. No numbers.
    Voice
    Every concern lands on a decision already made, and comes back later as a second announcement and more meetings.
    On screen
    Every concern raised had already been decided against.
  4. The mechanism0:21-0:40screen

    Picture
    Drawn Needs you screen, Example tag top left, context ‘Company crew’, cursor visible. Step band on prepare: callout 1 on Drafted by, ‘Priya, support process owner’. Step band on review: callout 2 on Answered by, ‘31 of 38 affected people’; callout 3 on Objections, ‘12, each with a written answer’. Cursor then moves to Changed by answers and Still open.
    Voice
    Priya, nearest the work, approved the draft. Then the people it changes answered: 31 of 38, twelve objections, each answered in writing and kept with the decision. Night shift keeps its own queue. Weekend cover is still open.
    On screen
    Example · Decide on merging the support queues
  5. The decision0:40-0:48person and screen

    Picture
    Step band on decide. ‘Approve the change’, ‘Change’ and ‘Pass’ visible. Click on approve held two seconds. Heading becomes ‘Decided’; row reads ‘Sam, COO and sponsor, 18 Mar · approved’. Guide in picture-in-picture.
    Voice
    Sam, the sponsor, decides with every objection and its answer attached: approve the change, change it, or pass.
    On screen
    Decided. Every objection and its answer attached.
  6. The difference0:48-0:56person

    Picture
    Guide in the same framing as The moment, inset of two timelines side by side: ‘Decide, announce, ask’ above ‘Draft, answer, decide’.
    Voice
    Nobody holds listening sessions after the announcement any more. The helper drafts and groups the answers; the sponsor decides. It does not watch, score or replace anyone.
    On screen
    Affected people answer the draft before anyone decides.
  7. Outro0:56-1:00sting

    Picture
    Standard end card, the same in every video: the page title, the brand mark and one small line, ‘Example screens’.
    On screen
    Asked after the slides were printed

On screen as proof

  • Example Needs you screen: ‘31 of 38 affected people’ answered, ‘12, each with a written answer’
  • ‘Changed by answers: Night shift keeps its own queue’
  • ‘Approve the change’ click held two seconds, Change and Pass visible

Before and after

Before
Early consultation feels risky, so the sponsor signs off, then asks
After
Affected teams answer the draft before sponsor sign-off
Before
Impact assessed by people furthest from the work
After
The role nearest the work drafts the impact first
Before
Objections logged in a survey nobody closes
After
Every objection gets a written answer before deciding

How it works

The draft goes to the people it changes first, and the decision record keeps each objection with its answer.

  1. The impact by role is drafted first, with the process owner nearest the work, who approves it before anyone decides.
  2. Each affected team answers the draft; the change lead writes an answer to every objection, kept with the decision.
  3. The sponsor decides with every objection and its answer attached, and the decision records what the answers changed, for each person to see.
Needs youExample

Company crew

Decide on merging the support queues

Drafted by
Priya, support process owner
Answered by
31 of 38 affected people
Objections
12, each with a written answer
Changed by answers
Night shift keeps its own queue
Still open
Weekend cover, answer due Thu
Decides
Sam, COO and sponsor

Source: change draft, 14 Mar

Approve the changeChangePass

Built to work in the email, calendar, chat, finance and sales tools you already use.

What it never does

  • Acts alone only inside limits a person sets; asks first for anything else.
  • Reaches only what its job needs.
  • Never watches, scores or replaces anyone.