Soundly RunSound familiar?

Every number hit. Priority slipped.

Every unit hit its scorecard, and the company's top priority still slipped, because no unit's number carried it.

InsteadEach unit's scorecard carries a share of the company's top priority.

The video

Video planned54 secondsHow every video is made
The script
The one point
The company’s top priority reaches every unit’s scorecard as a measured row, under one definition.
Why a video
Time passing: a whole year of green scorecard ticks plays out in seconds while the company aim’s bar stays flat, a gap text can state but not make felt.
  1. Intro0:00-0:03sting

    Picture
    Brand mark and sound, then the heading ‘Every number hit. Priority slipped.’ on the site’s background, fading straight into the guide with no black.
    On screen
    Every number hit. Priority slipped.
  2. The moment0:03-0:10person

    Picture
    Guide seated in the usual room and framing, to camera. Lower third: guide’s first name, Soundly Run guide.
    Voice
    Every region hits its scorecard. The company’s top priority still slips. In a company this shape, no unit’s number was ever tied to it.
    On screen
    Guide’s first name, Soundly Run guide
  3. The cost0:10-0:17motion

    Picture
    Three region scorecards tick green month by month, Q1 through Q4. Beside them a bar labelled One customer platform by Q4 barely moves. At Q4 the ticks stay green and the aim bar turns red. Example tag top left, no figures.
    Voice
    Month after month, every box goes green. The aim does not move. A whole year passes before anyone sees it.
    On screen
    Example: every box green. The aim stood still.
  4. The mechanism0:17-0:26screen

    Picture
    Drawn Priorities screen, Example tag top left, context ‘Company crew’. Heading: Every region hit its number; none moves this aim. Step band on prepare. Callout 1 on Company aim, callout 2 on the Gap row.
    Voice
    A helper flags the gap: one customer platform by Q4 is the aim, and no region’s scorecard row drives it.
    On screen
    No region’s scorecard row drives this aim
  5. The mechanism0:26-0:35screen

    Picture
    Step band on review. Cursor moves to Draft row: North, 40% of accounts to the platform by June. Then Measured as, one definition for every region. Then Sits with: #2 Platform move. Then Owner: Ivo, North’s lead.
    Voice
    It drafts a row for North: 40% of accounts on the platform by June, measured one way for every region, under number 2, the platform move.
    On screen
    North: move 40% of accounts by June
  6. The decision0:35-0:43person and screen

    Picture
    Step band on decide. Add North’s row, Change and Pass all visible. Ivo’s cursor clicks Add North’s row, held two seconds. Heading turns to North’s work now drives the aim. Guide in picture-in-picture.
    Voice
    Ivo, North’s lead, decides: add North’s row, change it, or pass. He adds it. Row added under number 2. Decided by Ivo.
    On screen
    Row added under #2. Decided by Ivo.
  7. The difference0:43-0:50person

    Picture
    Guide back in the same framing as The moment.
    Voice
    Nobody finds the gap at year end any more, after a year of green boxes. The helper drafts the row; Ivo decides. It does not watch, score or replace anyone.
    On screen
    Each unit's scorecard carries a share of the company's top priority.
  8. Outro0:50-0:54sting

    Picture
    Standard end card, the same in every video: the page title, the brand mark and one small line, ‘Example screens’.
    On screen
    Every number hit. Priority slipped.

On screen as proof

  • Example-tagged screen: Gap row, No region’s scorecard row drives this aim
  • Draft row with one shared definition: accounts live on the platform over active accounts
  • Add North’s row click held two seconds, confirmation: Row added under #2. Decided by Ivo.

Before and after

Before
Each team chases its own metric; the shared aim is nobody’s
After
Each unit metric traces to a company priority
Before
The priority is tracked on one lagging year-end number
After
Each unit row carries a leading indicator, reviewed monthly
Before
Every team defines 'migrated' its own way
After
One metric definition, held in the Knowledge base

How it works

The company's priority reaches every unit's scorecard: a measured row each unit's lead owns, under one shared definition.

  1. Any company priority that no unit's scorecard carries is flagged; the priority's owner confirms the gap.
  2. Each unit's lead decides their row: a share of the priority, a leading indicator, and the one shared definition.
  3. The executive team signs off every row at quarterly planning; each is checked monthly.
PrioritiesExample

Company crew

Every region hit its number; none moves this aim

Company aim
One customer platform by Q4
Gap
No region's scorecard row drives this aim
Draft row
North: move 40% of accounts to the platform by June
Measured as
Accounts live on the platform over active accounts, one definition for every region
Sits with
#2 Platform move, the company's rank
Owner
You, Ivo, North's lead; the aim's owner was asked

Example · Quarterly planning, 14 Oct

Add North's rowChangePass

Built to work in the email, calendar, chat, finance and sales tools you already use.

What it never does

  • Acts alone only inside limits a person sets; asks first for anything else.
  • Reaches only what its job needs.
  • Never watches, scores or replaces anyone.