The ask grew on the way
They asked for a download. Three handoffs later, the plan is a six-month build nobody asked for.
InsteadThe smallest fix that meets the ask is costed first, before any big build.
The video
Video planned60 secondsHow every video is made
The script
- The one point
- The original ask travels word for word beside every plan, with the smallest option that meets it costed first.
- Why a video
- Cause and effect rippling: one quoted ask visibly swells at each of three handoffs; then the same ask shown twice, small option beside full plan, and a person choosing live.
- Picture
- Brand mark and sound, then the heading ‘The ask grew on the way’ on the site’s background, fading straight into the guide with no black.
- On screen
- The ask grew on the way
- Picture
- Guide in the standard room and place. Lower third: guide’s first name, ‘Soundly Run guide’. Burned-in captions.
- Voice
- They asked for a download. Three handoffs later, it is a six-month build. The more teams sit between asker and builder, the more each retelling adds.
- On screen
- They asked for a download.
- Picture
- A small quote card passes through three team icons, growing at each handoff into a large plan. It resolves into ‘34%’, held four seconds. ‘Source: PMI, 2021’ fixed in the corner throughout.
- Voice
- The Project Management Institute found 34 percent of projects saw scope creep: work growing beyond what was first agreed.
- On screen
- 34% of projects: scope creep. Source: PMI, 2021
- Picture
- Drawn Priorities screen, Example tag top left, context ‘Company crew’, cursor visible, step band prepare, review, decide. Callout 1: ‘The ask’, Tom’s quote, 8 Oct. Callout 2: smallest option, about 2 days, and ‘It misses: Nothing in the ask’. Callout 3: full plan, about 6 months, and ‘Plan adds’, no requester named.
- Voice
- The plan carries Tom’s ask, word for word. The smallest option: a download button, about two days, missing nothing in the ask. Beside it, the six-month plan, whose extras name no requester.
- On screen
- Example · Customer downloads: the smallest option first
- Picture
- ‘Ship the smallest option’, ‘Take the full plan’ and ‘Pass’ visible. Click on ship held two seconds. Row becomes ‘Download button on the jobs list, chosen by Marco’. Guide in picture-in-picture.
- Voice
- Marco decides: ship the smallest option, take the full plan, or pass. Both stay on the decision record.
- On screen
- Chosen. Both options stay on the decision record.
- Picture
- Guide in the same framing as The moment.
- Voice
- Nobody digs back through three handoffs for the original ask. The helper drafts; Marco decides. It does not watch, score or replace anyone.
- On screen
- The smallest fix that meets the ask is costed first, before any big build.
- Picture
- Standard end card, the same in every video: the page title, the brand mark and one small line, ‘Example screens. Source: PMI, 2021’.
- On screen
- The ask grew on the way
On screen as proof
- 34% of projects experienced scope creep, Source: PMI, 2021
- Example screen: Tom’s quoted ask, 8 Oct, beside ‘about 2 days’ and ‘about 6 months’
- ‘Ship the smallest option’ click held two seconds, other choices visible
Before and after
- Before
- Each retelling adds a sensible extra; small looks like a half-job
- After
- The original ask travels verbatim, quoted and dated
- Before
- Nobody can trace a requirement to its requester
- After
- Every addition names who asked for it
- Before
- Small asks queue behind big builds; lead time balloons
- After
- Smallest option ships in days, full plan stays open
How it works
The original ask travels word for word beside every plan, with the smallest option that meets it costed first, for the decider to pick.
- The ask is kept word for word, with who asked and when, and every plan built from it carries the quote.
- Beside any large plan sits the smallest option that meets the quoted ask; each addition names who asked for it, and the asker confirms.
- The plan's decider picks either; both stay on the decision record, and the full plan can return later.
PrioritiesExample
Company crew
Customer downloads: the smallest option first
- The ask
- “Let customers download their jobs.” Tom, support, 8 Oct
- Smallest option
- Download button on the jobs list (CSV), about 2 daysDownload button on the jobs list, chosen by Marco
- It misses
- Nothing in the ask
- Full plan
- Usage dashboard as a new priority, about 6 months
- Plan adds
- Live charts and filters, no requester named
Source: support ticket, 8 Oct
Ship the smallest optionTake the full planPassChosen. Both options stay on the decision record.
Built to work in the email, calendar, chat, finance and sales tools you already use.
What it never does
- Acts alone only inside limits a person sets; asks first for anything else.
- Reaches only what its job needs.
- Never watches, scores or replaces anyone.