Soundly RunSound familiar?

The data room nobody kept

An investor’s diligence list asks for every key decision since the last round. It takes your team three weeks to rebuild it.

InsteadWhen investors ask what was decided and why, the answer is already kept.

The video

Video planned54 secondsHow every video is made
The script
The one point
Diligence asks what was decided, when and why; a decision record kept all along answers it instead of three weeks of rebuilding.
Why a video
Time passing: three weeks of digging through old threads, in seconds. Then the same list drawn from the decision record, and the founder’s click held.
  1. Intro0:00-0:03sting

    Picture
    Brand mark and sound, then the heading ‘The data room nobody kept’ on the site’s background, fading straight into the guide with no black.
    On screen
    The data room nobody kept
  2. The moment0:03-0:10person

    Picture
    The guide in the usual place and framing. Lower third with first name and ‘Soundly Run guide’.
    Voice
    An investor’s diligence list asks for every key decision since the last round. It takes your team three weeks to rebuild it. In a small company, everyone was in the room, so nobody wrote the reasons down.
    On screen
    Three weeks to rebuild what was decided
  3. The cost0:10-0:18motion

    Picture
    Example badge top left. A checklist arrives. A calendar ticks through three weeks while people scroll old chat threads and knock on doors; question marks hang beside half the lines. The round’s timeline waits. No outside figures.
    Voice
    Three weeks of old threads and knocking on doors, while the round waits. The reasons live only in people’s memory.
    On screen
    Example: three weeks in old threads and memory
  4. The mechanism0:18-0:27screen

    Picture
    Drawn Record screen, Example tag top left, context ‘Dana’s crew’. Step band on ‘prepare’. Heading ‘Diligence list: 14 key decisions since the last round’. Callout 1 on Asked for. Callout 2 on In the decision record: ‘12 of 14, each with decider, date and reason’.
    Voice
    Each key decision went into the decision record as it was made: what, who, when and why. A helper drafts the list from it.
    On screen
    Example: 12 of 14 already kept
  5. The mechanism0:27-0:36screen

    Picture
    Same screen, step band on ‘review’. Callout 3 on No why kept: ‘Support moved in-house, Jun 2025, decided on a call’. Cursor moves to No decider kept, then Before sharing: ‘Mei, legal, checks what may go to the investor’, then Drafted.
    Voice
    Two gaps show, each with who to ask. Legal checks what may be shared before anything leaves.
    On screen
    Example: two gaps, each with who to ask
  6. The decision0:36-0:43person and screen

    Picture
    Step band on ‘decide’. ‘Send to Mei, ask for the gaps’, ‘Change’ and ‘Pass’ all visible. Cursor clicks ‘Send to Mei, ask for the gaps’, held two seconds. Heading turns ‘With Mei for review’; row reads ‘12 with Mei; Priya and Lena asked for the 2 gaps’. Guide in picture-in-picture.
    Voice
    Dana decides: send to Mei and ask for the gaps, change it, or pass. Her click sends the list to Mei, and Priya and Lena are asked for the gaps.
    On screen
    Sent. The investor sees the list once Mei clears it.
  7. The difference0:43-0:50person

    Picture
    The guide, same place and framing as the moment, so it reads as a return.
    Voice
    Nobody rebuilds a data room from old threads any more. A helper drafts; Dana and Mei decide. It does not watch, score or replace anyone.
    On screen
    When investors ask, the answer is already kept.
  8. Outro0:50-0:54sting

    Picture
    Standard end card, the same in every video: the page title, the brand mark and one small line, ‘Example screens’.
    On screen
    The data room nobody kept

On screen as proof

  • Record screen with the diligence list, walked row by row, tagged Example
  • Example figures ‘14 key decisions’ and ‘12 of 14’ only inside the tagged screen
  • Send, Change and Pass all visible; click held two seconds

Before and after

Before
Everyone was in the room, so nobody wrote the reason down
After
Each key decision kept as it is made: what, who, when, why
Before
The data room is only built once a round or a sale starts (due diligence)
After
The decision record already holds it, so diligence starts from it
Before
Reasons live in old chat threads and people’s memory
After
A key decision with no why or decider shows early

How it works

Key decisions go into the decision record as they are made, so diligence reads it instead of rebuilding it.

  1. As each key decision is made, the decider keeps what, when and why in the decision record.
  2. Each quarter, the founder sees key decisions missing a why or a decider; owners fill the gaps while memory is fresh.
  3. When investors ask, the list is drafted from the decision record; legal checks what may be shared, and the founder decides what goes.
RecordExample

Dana's crew

Diligence list: 14 key decisions since the last round

Asked for
Every key decision since the last round, with its why
In the decision record
12 of 14, each with decider, date and reason
No why kept
Support moved in-house, Jun 2025, decided on a call
No decider kept
Reseller deal ended, Feb 2026
Before sharing
Mei, legal, checks what may go to the investor
Drafted
12 to Mei; ask Priya and Lena for the 2 gaps

Source: decision record, 20 Oct

Send to Mei, ask for the gapsChangePass

Built to work in the email, calendar, chat, finance and sales tools you already use.

What it never does

  • Acts alone only inside limits a person sets; asks first for anything else.
  • Reaches only what its job needs.
  • Never watches, scores or replaces anyone.