We start ten, stop none
Starting an initiative takes one yes. Stopping one has no owner and no moment, so the list only grows.
InsteadA new start names what stops before it starts.
The video
Video planned54 secondsHow every video is made
The script
- The one point
- Someone holds the right to stop, so a new start names what stops before it starts and the change list stops only growing.
- Why a video
- Time passing: one employee’s stack of changes grows from two in 2016 to ten in 2022 in seconds, then the decision shows one in, one out.
- Picture
- Brand mark and sound, then the heading ‘We start ten, stop none’ on the site’s background, fading straight into the guide with no black.
- On screen
- We start ten, stop none
- Picture
- Guide seated in the usual room and framing, to camera. Lower third: guide’s first name, Soundly Run guide.
- Voice
- Starting an initiative takes one yes, and stopping one has no owner. In a company with many sponsors, the list only grows.
- On screen
- Guide’s first name, Soundly Run guide
- Picture
- Timeline runs 2016 to 2022. Change cards stack on one figure of an employee, two at the start, ten by the end. Fixed corner caption throughout: Source: Harvard Business Review, 2023.
- Voice
- The average employee went through 10 planned company-wide changes in 2022, up from two in 2016.
- On screen
- 10 changes in 2022, up from 2 in 2016
- Picture
- Drawn Priorities screen, Example tag top left, context ‘Company crew’. Heading: New: returns automation. Something has to give. Step band on prepare. Callout 1 on Capacity (over by 12%) and callout 2 on Change load (7 changes this quarter). Side panel ‘Who decides, operations’: any sponsor may start; stop, park or re-date is yours.
- Voice
- A new start arrives: returns automation, ranked number 6. Any sponsor may start; only the named decider may stop. A helper drafts the cost. Operations hours would go 12% over, with 7 changes already landing.
- On screen
- New: returns automation. Something has to give.
- Picture
- Step band on review. Cursor moves to Would starve: #11 Vendor scorecards and #12 Office move review. Then Owners asked: Jo and Sam, both answered in writing. Then callout 3 on Drafted: park #12 with its reason, re-date #11 to March.
- Voice
- It names what would starve. Both owners answered in writing. The draft: park number 12 with its reason, and move number 11 to March.
- On screen
- Park #12 with its reason; re-date #11
- Picture
- Step band on decide. Three actions visible: Park #12, re-date #11; Go over, with a reason; Change. Click on the first, held two seconds. Rows turn: Operations hours back inside capacity; Still 7 changes: one in, one out. Guide in picture-in-picture.
- Voice
- The named decider chooses: park number 12 and re-date number 11, go over with a reason, or change it. They park and re-date. What gave is in the decision record, with why.
- On screen
- Still 7 changes: one in, one out
- Picture
- Guide back in the same framing as The moment.
- Voice
- Nobody has to fight to stop a project once it is running. The helper drafts the trade; a person decides. It does not watch, score or replace anyone.
- On screen
- A new start names what stops before it starts.
- Picture
- Standard end card, the same in every video: the page title, the brand mark and one small line, ‘Example screens. Source: Harvard Business Review, 2023’.
- On screen
- We start ten, stop none
On screen as proof
- Figure: 10 planned changes in 2022 versus two in 2016, Source: Harvard Business Review (Gartner data), 2023
- Example-tagged screen showing operations hours 12% over and 7 changes landing
- Click held two seconds, result: Still 7 changes: one in, one out
- Confirmation: Decided. What gave is in the decision record, with why.
Before and after
- Before
- So many changes land at once that none sticks (change saturation)
- After
- Each team's change load shows before anything starts
- Before
- Stopping means telling a sponsor their project lost
- After
- Every start names what stops, and who signs it
- Before
- The same people staff six initiatives
- After
- Team capacity is checked before a start lands
How it works
The right to stop gets a named holder; every new start names what gives, or goes over capacity knowingly, in writing.
- Who decides names, for each area, who may start and who holds the right to stop.
- Each team’s change load and what would starve are drafted; owners of what would starve answer in writing, and each team lead confirms their load.
- The decider parks, re-dates or goes over, and the reason goes in the decision record for everyone affected to read.
PrioritiesExample
Company crew
New: returns automation. Something has to give.Returns automation starts; two things give
- Proposed
- Returns automation, ranked #6
- Capacity
- Operations hours over by 12% if it startsOperations hours back inside capacity
- Change load
- Operations team: 7 changes landing this quarterStill 7 changes: one in, one out
- Would starve
- #11 Vendor scorecards and #12 Office move review#12 in Not now, with reason; #11 from March
- Owners asked
- Jo and Sam, both answered in writing
- Drafted
- Park #12 with its reason; re-date #11 to March
Example · Capacity, 14 Oct
Park #12, re-date #11Go over, with a reasonChangeDecided. What gave is in the decision record, with why.
Built to work in the email, calendar, chat, finance and sales tools you already use.
What it never does
- Acts alone only inside limits a person sets; asks first for anything else.
- Reaches only what its job needs.
- Never watches, scores or replaces anyone.