Soundly RunSound familiar?

We start ten, stop none

Starting an initiative takes one yes. Stopping one has no owner and no moment, so the list only grows.

InsteadA new start names what stops before it starts.

The video

Video planned54 secondsHow every video is made
The script
The one point
Someone holds the right to stop, so a new start names what stops before it starts and the change list stops only growing.
Why a video
Time passing: one employee’s stack of changes grows from two in 2016 to ten in 2022 in seconds, then the decision shows one in, one out.
  1. Intro0:00-0:03sting

    Picture
    Brand mark and sound, then the heading ‘We start ten, stop none’ on the site’s background, fading straight into the guide with no black.
    On screen
    We start ten, stop none
  2. The moment0:03-0:10person

    Picture
    Guide seated in the usual room and framing, to camera. Lower third: guide’s first name, Soundly Run guide.
    Voice
    Starting an initiative takes one yes, and stopping one has no owner. In a company with many sponsors, the list only grows.
    On screen
    Guide’s first name, Soundly Run guide
  3. The cost0:10-0:17motion

    Picture
    Timeline runs 2016 to 2022. Change cards stack on one figure of an employee, two at the start, ten by the end. Fixed corner caption throughout: Source: Harvard Business Review, 2023.
    Voice
    The average employee went through 10 planned company-wide changes in 2022, up from two in 2016.
    On screen
    10 changes in 2022, up from 2 in 2016
  4. The mechanism0:17-0:26screen

    Picture
    Drawn Priorities screen, Example tag top left, context ‘Company crew’. Heading: New: returns automation. Something has to give. Step band on prepare. Callout 1 on Capacity (over by 12%) and callout 2 on Change load (7 changes this quarter). Side panel ‘Who decides, operations’: any sponsor may start; stop, park or re-date is yours.
    Voice
    A new start arrives: returns automation, ranked number 6. Any sponsor may start; only the named decider may stop. A helper drafts the cost. Operations hours would go 12% over, with 7 changes already landing.
    On screen
    New: returns automation. Something has to give.
  5. The mechanism0:26-0:35screen

    Picture
    Step band on review. Cursor moves to Would starve: #11 Vendor scorecards and #12 Office move review. Then Owners asked: Jo and Sam, both answered in writing. Then callout 3 on Drafted: park #12 with its reason, re-date #11 to March.
    Voice
    It names what would starve. Both owners answered in writing. The draft: park number 12 with its reason, and move number 11 to March.
    On screen
    Park #12 with its reason; re-date #11
  6. The decision0:35-0:43person and screen

    Picture
    Step band on decide. Three actions visible: Park #12, re-date #11; Go over, with a reason; Change. Click on the first, held two seconds. Rows turn: Operations hours back inside capacity; Still 7 changes: one in, one out. Guide in picture-in-picture.
    Voice
    The named decider chooses: park number 12 and re-date number 11, go over with a reason, or change it. They park and re-date. What gave is in the decision record, with why.
    On screen
    Still 7 changes: one in, one out
  7. The difference0:43-0:50person

    Picture
    Guide back in the same framing as The moment.
    Voice
    Nobody has to fight to stop a project once it is running. The helper drafts the trade; a person decides. It does not watch, score or replace anyone.
    On screen
    A new start names what stops before it starts.
  8. Outro0:50-0:54sting

    Picture
    Standard end card, the same in every video: the page title, the brand mark and one small line, ‘Example screens. Source: Harvard Business Review, 2023’.
    On screen
    We start ten, stop none

On screen as proof

  • Figure: 10 planned changes in 2022 versus two in 2016, Source: Harvard Business Review (Gartner data), 2023
  • Example-tagged screen showing operations hours 12% over and 7 changes landing
  • Click held two seconds, result: Still 7 changes: one in, one out
  • Confirmation: Decided. What gave is in the decision record, with why.

Before and after

Before
So many changes land at once that none sticks (change saturation)
After
Each team's change load shows before anything starts
Before
Stopping means telling a sponsor their project lost
After
Every start names what stops, and who signs it
Before
The same people staff six initiatives
After
Team capacity is checked before a start lands

How it works

The right to stop gets a named holder; every new start names what gives, or goes over capacity knowingly, in writing.

  1. Who decides names, for each area, who may start and who holds the right to stop.
  2. Each team’s change load and what would starve are drafted; owners of what would starve answer in writing, and each team lead confirms their load.
  3. The decider parks, re-dates or goes over, and the reason goes in the decision record for everyone affected to read.
PrioritiesExample

Company crew

New: returns automation. Something has to give.

Proposed
Returns automation, ranked #6
Capacity
Operations hours over by 12% if it starts
Change load
Operations team: 7 changes landing this quarter
Would starve
#11 Vendor scorecards and #12 Office move review
Owners asked
Jo and Sam, both answered in writing
Drafted
Park #12 with its reason; re-date #11 to March

Example · Capacity, 14 Oct

Park #12, re-date #11Go over, with a reasonChange

Built to work in the email, calendar, chat, finance and sales tools you already use.

What it never does

  • Acts alone only inside limits a person sets; asks first for anything else.
  • Reaches only what its job needs.
  • Never watches, scores or replaces anyone.