Soundly RunSound familiar?

KPIs that take a quarter

The quarter's KPIs get signed off in week nine, after most of the work they were meant to steer is done.

InsteadKPIs signed off before the quarter starts, drafted from your plan.

The video

Video planned55 secondsHow every video is made
The script
The one point
Next quarter’s measures arrive drafted and sourced before it starts, so they steer the work.
Why a video
Time passing and the same moment twice: a quarter’s weeks run by while measures are argued, signed in week nine; the same quarter again, measure confirmed 22 Dec, before 1 Jan.
  1. Intro0:00-0:03sting

    Picture
    Brand mark and sound, then the heading ‘KPIs that take a quarter’ on the site’s background, fading straight into the guide with no black.
    On screen
    KPIs that take a quarter
  2. The moment0:03-0:11person

    Picture
    The guide at the usual place, same room and framing, speaking to camera. Lower third on first appearance.
    Voice
    The quarter’s KPIs get signed off in week nine, after most of the work they were meant to steer is done. With many teams, each measure is argued in meeting after meeting.
    On screen
    [First name], Soundly Run guide
  3. The cost0:11-0:19motion

    Picture
    A quarter’s calendar: weeks tick past while measure cards bounce between meetings, unsigned. The sign-off stamp lands late, with most of the quarter already shaded done. No numbers.
    Voice
    Every week of argument is a week the work runs with nothing to steer it.
    On screen
    Signed off after most of the work is done
  4. The mechanism0:19-0:35screen

    Picture
    Drawn Needs you screen, Example tag top left, context ‘Lena’s crew’. Step band on prepare: callout 1 on Priority, Renewals first, set by Dana; callout 2 on Measure, drafted from four quarters of billing. Step band on review: callout 3 on Timing, Draft ready 22 Dec, quarter starts 1 Jan.
    Voice
    From Dana’s priority, a helper drafts renewal rate from four quarters of billing. It is ready on 22 December, before the quarter starts.
    On screen
    Example: set next quarter’s renewal measure
  5. The decision0:35-0:44person and screen

    Picture
    Step band on decide. Cursor on Confirm renewal rate, Change and Pass visible; click holds two seconds in silence. Other measures row turns to 3 of 4 confirmed; Owner row turns to Confirmed by Lena, 22 Dec. Guide in picture-in-picture.
    Voice
    Lena is closest to this number, so she decides: confirm renewal rate, change it, or pass. Confirmed. Three of four measures agreed.
    On screen
    Confirmed by Lena. 3 of 4 measures agreed.
  6. The difference0:44-0:51person

    Picture
    Guide in the same framing as The moment. Inset, two quarter timelines side by side: sign-off landing in week nine, and the measure confirmed 22 Dec before the quarter opens.
    Voice
    Nobody argues measures into week nine any more. The helper drafts; owners decide. It does not watch, score or replace anyone.
    On screen
    KPIs signed off before the quarter starts, drafted from your plan.
  7. Outro0:51-0:55sting

    Picture
    Standard end card, the same in every video: the page title, the brand mark and one small line, ‘Example screens’.
    On screen
    KPIs that take a quarter

On screen as proof

  • Example screen: Renewal rate, drafted from four quarters of billing
  • Timing: Draft ready 22 Dec; quarter starts 1 Jan
  • Confirm renewal rate click held 2 seconds, row reads Confirmed by Lena, 22 Dec

Before and after

Before
Measures rebuilt from scratch each quarter, in meetings
After
Drafted from priorities, baselined on four quarters of data
Before
Nobody owns the date, so sign-off drifts into the quarter
After
Each draft ready before the quarter, with time to confirm
Before
One late measure holds up the whole set
After
Each measure confirmed on its own by its owner

How it works

Next quarter’s measures arrive drafted and sourced, and their owners confirm them before the quarter starts.

  1. Before the quarter, each measure arrives drafted from the priorities and four quarters of data, with its source.
  2. The person closest to each number confirms it; the priority’s owner decides the target.
  3. Planning runs on its date; a measure without its owner's yes shows as unconfirmed, and the owner decides.
Needs youExample

Lena's crew

Set next quarter's renewal measure

Priority
Renewals first, set by Dana
Measure
Renewal rate, drafted from four quarters of billing
Timing
Draft ready 22 Dec; quarter starts 1 Jan
Other measures
2 of 4 confirmed, 1 waiting on its owner
Owner
You, Lena: your yes makes it count

Source: billing, last four quarters

Confirm renewal rateChangePass

Built to work in the email, calendar, chat, finance and sales tools you already use.

What it never does

  • Acts alone only inside limits a person sets; asks first for anything else.
  • Reaches only what its job needs.
  • Never watches, scores or replaces anyone.